Astute-class submarine
![]() HMS Ambush on sea trials in December 2012
|
|
Class overview | |
---|---|
Builders: | BAE Systems Maritime – Submarines, Barrow-in-Furness |
Operators: | ![]() |
Preceded by: | Trafalgar class |
Cost: | £1,160M each (boats 1-3), £747M each (boats 4-6)[1] |
Built: | 2001–present |
In commission: | 2010–present |
Building: | 3 |
Planned: | 7 |
Completed: | 3 |
Active: | 2 |
General characteristics | |
Class & type: | Nuclear-powered attack submarines |
Displacement: | |
Length: | 97 m (318 ft) |
Beam: | 11.3 m (37 ft) |
Draught: | 10 m (33 ft) |
Propulsion: | Rolls-Royce PWR 2 reactor, MTU 600 kilowatt diesel generators |
Speed: | Up to 30 knots (56 km/h), submerged[3] |
Range: | Only limited by food and maintenance requirements. |
Test depth: | Over 300 m |
Complement: | 98 (capacity for 109) |
Sensors and processing systems: |
|
Armament: |
|
The Astute class is the latest class of nuclear-powered attack submarines in service with the British Royal Navy.[5] The class sets a new standard for the Royal Navy in terms of weapons load, communication facilities and stealth. The boats are being constructed by BAE Systems Maritime – Submarines at Barrow-in-Furness.[6] Seven boats will be constructed. The first of class, Astute, was launched in 2007 and commissioned in 2010, and the second, Ambush, was launched on 6 January 2011,[7] and commissioned on 1 March 2013.[8] Astute was declared fully operational in May 2014,[9] and both she and Ambush have sailed for their maiden deployments. The third of class, Artful, arrived on 19 August 2015 in HMNB Clyde for sea trials and is due to be commissioned in March 2016. She was handed over to the Royal Navy on the 14th December, 2015.[10] The Astute-class vessels are the replacements for the Trafalgar-class & Swiftsure-class fleet submarines in Royal Navy service.
Contents
Development
The Royal Navy has changed its submarine-employment strategy from the Cold War emphasis on anti-submarine warfare to the concept of "Maritime Contributions to Joint Operations."[11] Approval for studies to define the "Batch 2 Trafalgar class" (what would become the Astute class) was given in June 1991. In July 1994 risk reduction studies were authorised in parallel with the formal bid phase of the project.[12] On 17 March 1997, the Ministry of Defence announced that it would place a £2 billion order for three submarines and that they would be called the Astute class. On 26 March 1997 the contract was signed with GEC-Marconi for the first three boats: Astute, Ambush and Artful. These names were last given to Amphion-class submarines that entered service towards the end of World War II. GEC would build the submarines at its VSEL subsidiary (now BAE Systems Submarine Solutions).
Original plans were for seven boats of the Astute class to replace five Swiftsure-class submarines (Sovereign, Superb, Sceptre, Spartan, and Splendid) and the two oldest Trafalgar-class boats (Trafalgar and Turbulent). The Swiftsure class entered service between 1973 and 1977 and were entirely decommissioned by 2010, when only the first of the Astute class was coming into service. Trafalgar was decommissioned in December 2009, to be followed by Turbulent in 2011.[13] An estimated 5,900 people are employed directly as a result of the project; 3,500 BAE Systems staff at Barrow and 2,400 other people around the UK.[14]
As of August 2006 BAE Systems was negotiating for a contract to build another four Astute-class submarines (hulls four to seven).[15] The fourth boat was ordered on 21 May 2007, to be called Audacious, and the names of the other hulls have been agreed as Agamemnon, Anson, and Ajax.[16] On 15 September 2011 it was announced that hull 5 would now be named Anson.[17] Upon the beginning of sea trials of Astute in November 2009, it was reported that long-lead items for hulls five and six have been ordered, including their nuclear reactor cores, and that the stated intention of the MoD was for a total of seven Astute-class submarines.[18] On 25 March 2010, BAE Systems was given the go-ahead by the government to begin construction on hulls 5 and 6, being given a £300 million contract for the "initial build" of hull five and "long lead procurement activities" for boat six.[19] In the same week the government re-affirmed their commitment to the construction of seven Astute-class submarines.
Work on the second and third submarines, Ambush and Artful, proceeded well with major milestones such as the closure of Ambush's reactor compartment, demonstrating significant schedule advance compared with Astute. BAE Systems and the MoD have made efforts to reduce costs and achieved significant cost-cutting and productivity gains.[20] A £580 million cost increase was agreed in 2007 due to maturing of the design requiring more materials, inflationary costs, and "some programme throughput assumptions at the Barrow site not being borne out."[12] First-of-class HMS Astute was launched by Camilla, Duchess of Cornwall on 8 June 2007.[21]
The order of seven Astute-class boats was confirmed in the Strategic Defence and Security Review of October 2010. In December that year it was confirmed by the MoD that "early work" was under way on boats five and six.[22]
On October 13, 2011, the fifth boat, Anson, was laid down at the Devonshire Dock Hall and is now under construction like boats three and four. On December 10, 2012 the MOD awarded BAE a £1.2 billion contract for work on Audacious. The MOD also confirmed on the same date a further £1.5 billion funding for submarines Anson, Agamemnon and Ajax.[citation needed] The MOD Defence Equipment Plan 2012 refers to 'the completion of the remainder of the seven class of Astute attack submarines'.[23] On 19 November 2015 a further £1.3 billion contract for Anson was announced by the MoD.[citation needed]
Programme delays
BAE Systems issued a profit warning on 11 December 2002 as a result of the cost overruns and delays it was experiencing with the Astute class and also the Nimrod MRA4 maritime reconnaissance/attack aircraft.[24] The delay was caused primarily by the problems of using 3D CAD; Armed Forces Minister Adam Ingram said in 2006 that "due to the complexity of the programme, the benefits that CAD was envisaged to provide were more difficult to realise than either MoD or the contractor had assumed."[25] Other issues were the insufficient capabilities within GEC-Marconi which became evident after contract-award and poor programme management.[14][26][27] BAE and the Ministry of Defence reached an agreement in February 2003 whereby they would invest £250 million and £430 million respectively to address the programme's difficulties.[12]
A major element of this was the enlisting of advice and expertise from General Dynamics Electric Boat.[28] The MoD also signed a design and production drawing work contract through the U.S. Navy which ran from 2004 to 2007.[29]
As of March 2008 the programme was 48 per cent (or £1.2 billion) over-budget and 47 months late.[12] Further delays due to a range of technical and programme issues brought the programme to a position of 57 months late and 53 per cent (or £1.35 billion) over-budget by November 2009, with a forecast cost of £3.9 billion for the first three Astute boats.[30] In June 2012 the order was placed for the manufacture of the nuclear reactor for the seventh Astute-class submarine Ajax alongside the refurbishment of Rolls-Royce manufacturing facility in Raynesway, Derby and the development and production of the first reactor for the next generation of SSBN to replace the Vanguard class.[31]
Some serious quality assurance problems have been identified in the first boats built. Due to the failure of a pipe cap, made of incorrect material although construction records indicated the correct metal had been used, Astute was forced to surface following a leak that was flooding a compartment. Other problems have been identified, including the wrong type of lead being used in a reactor instrument, and other quality issues leading to early corrosion of components.[32][33]
Characteristics
The boats of the Astute class are powered by a Rolls-Royce PWR2 (Core H) (a pressurised water) reactor and fitted with a pump-jet propulsor. The PWR2 reactor was developed for the Vanguard-class ballistic missile submarines. As a result the new submarines are about 30 per cent larger than previous British fleet submarines, which were powered by smaller-diameter reactors. Like all Royal Navy submarines, the bridge fin of the Astute-class boats is specially reinforced to allow surfacing through ice caps. These submarines can also be fitted with a dry deck shelter, which allows special forces (e.g. SBS) to deploy whilst the submarine is submerged.[34] More than 39,000 acoustic tiles mask the vessel's sonar signature, giving the Astute class a better stealth quality than any other submarine previously operated by the Royal Navy.[35] Speculation released by the media stated that by using advanced stealth technology Astute "makes less noise than a baby dolphin, making her as good as undetectable by enemy ships."[36]
Astute is the second Royal Navy submarine class, after the Vanguard class, to have a bunk for each member of the ship's company,[37] ending the practice of 'hot bunking', whereby two sailors on opposite watches shared the same bunk at different times. However, they have less mess-deck space than the Valiant-class submarine built 45 years earlier.[38][39]
Weapons and systems

The Astute class has stowage for 38 weapons and would typically carry both Spearfish heavy torpedoes and Tomahawk Block IV cruise missiles, the latter costing £870,000 each.[40] The Tomahawk missiles are capable of hitting a target to within a few metres within a range of 1,240 miles (2,000 kilometres).[41] The Astute class will also be able to fire the new "tactical Tomahawk" currently under development. The Astute Combat Management System is an evolved version of the Submarine Command System used on other classes of British submarine. The system receives data from the boat's sensors and displays real time imagery on all command consoles. The submarines also have Atlas Hydrographic DESO 25 high-precision echosounders, two CM010 non-hull-penetrating optronic masts—in place of conventional periscopes—which carry thermal imaging and low-light TV and colour CCD TV sensors.[42] The class also mounts a Raytheon Successor IFF system.
For detecting enemy ships and submarines the Astute class are equipped with the sophisticated Thales Underwater Systems Sonar 2076, an integrated passive/active search and attack sonar suite with bow, intercept, flank and towed arrays. BAE claims that the 2076 represents a "step change" over previous sonars and is the world's most advanced and effective sonar system.[43]
In 2012, during simulated battles with the United States Navy's latest Virginia-class submarine (the USS New Mexico), it was reported that the Americans were "taken aback" by Astute's capabilities. Royal Navy Commander Iain Breckenridge was quoted saying: “Our sonar is fantastic and I have never before experienced holding a submarine at the range we were holding USS New Mexico. The Americans were utterly taken aback, blown away with what they were seeing.”[44][45]
Boats of the class
Some aspects of the later Astute-class submarines will be different from boats 1-3, mostly related to the combat system—primarily the command, navigation and sonar systems. Audacious is the first Royal Navy submarine to use a shared computer environment for the different systems, common consoles and cabinets, and commercial "off-the-shelf" hardware and software, to reduce costs and improve maintainability. These changes have been back-fitted to boat 3, Artful; the eventual aim is to back-fit the "Common Combat System" to Astute and Ambush, and progressively to the rest of the Royal Navy submarine fleet.[46]
Name | Hull | Pennant number | Status | Ordered | Laid down | Launched | Date of commission |
---|---|---|---|---|---|---|---|
Astute | 1 | S119 | Active in service | 17 March 1997 | 31 January 2001 | 8 June 2007[47] | 27 August 2010[48] |
Ambush | 2 | S120 | Active in service[49] | 17 March 1997 | 22 October 2003 | 6 January 2011[7] | 1 March 2013[50] |
Artful | 3 | S121 | Awaiting commissioning | 17 March 1997 | 11 March 2005 | 17 May 2014[51] | March 2016 (planned)[10] |
Audacious | 4 | S122 | Under construction | 21 May 2007 | 24 March 2009 | In service 2018[52] | |
Anson | 5 | S123 | Under construction[53] | 25 March 2010 | 13 October 2011 | In service 2020[52] | |
Agamemnon | 6 | S124 | Under construction[54] | 25 March 2010 | 18 July 2013 | In service 2022[52] | |
Ajax or Boat 7[55][56] | 7 | S125 | Confirmed,[57] long-lead items ordered,[58] steel cut[59][60] | In service 2024[52] |
In fiction
The television series "The Last Ship" features the fictional Astute Class vessel HMS Achilles as the main opponent in season 2.
See also
- List of submarines of the Royal Navy
- Future of the Royal Navy
- Barracuda-class submarine, the latest for the French Navy, with the first to be launched in late 2017
- Virginia-class submarine, the latest in service with the United States Navy, first launched in 2003
- Yasen-class submarine, the latest in service with the Russian Navy, first launched in 2010
References
<templatestyles src="Reflist/styles.css" />
Cite error: Invalid <references>
tag; parameter "group" is allowed only.
<references />
, or <references group="..." />
External links
![]() |
Wikimedia Commons has media related to Astute class submarines. |
- Naval Technology - Astute Class
- How to Build A Nuclear Submarine (Full) on YouTube—A documentary about the construction of an Astute class submarine by the BBC, summary available on the BBC's website
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Royal Navy Astute Class, royalnavy.mod.uk
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Astute Class, Royal Navy. Retrieved 25 December 2014.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 7.0 7.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 12.0 12.1 12.2 12.3 National Audit Office Ministry of Defence Major Projects Report 2008: Project Summary Sheets p.24
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 14.0 14.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ "Britain's £1.3bn new sub Astute sets sail" The Independent (17 November 2009)
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ National Audit Office Ministry of Defence Major Projects Report 2008: Project Summary Sheets "Exceptional difficulties arose with the introduction of a computer aided design system, the availability of trained staff and project management"
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Astute Fascinating Facts
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ BBC News Scotland, A vision of evolving technologies 30 August 2007, 13:06 GMT
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ HMS Astute arrives home from US sea trials
- ↑ Awesome Astute “Surpassed Every Expectation” on Her Toughest Test Yet
- ↑ BAE Systems News, 10 December 2012
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ HMS Ambush - Royal Navy
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ BAE Systems - Artful Launch
- ↑ 52.0 52.1 52.2 52.3 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Naval Ship Building Boat 5 news
- ↑ Sixth Astute Class submarine keel laid
- ↑ http://www.theyworkforyou.com/wrans/?id=2015-11-30.HL4049.h&s=%22astute%22+%22boat+7%22#gHL4049.r0
- ↑ http://www.baesystems.com/en/product/astute-class-submarines-enhanced
- ↑ Babcock contracted to provide Astute 6 & 7 weapons handling and launch system, February 1, 2013
- ↑ UK: BAE Systems Secures $ 1.92 Bln Submarine Deal
- ↑ £300M FACILITIES INVESTMENT WILL TRANSFORM UK SUBMARINE BUILDING, baesystems.com, 13 MARCH 2014
- ↑ Sub facilities deals boost Barrow's future, rina.org.uk, May 2014
- Pages with reference errors
- Use dmy dates from August 2012
- Articles with unsourced statements from August 2009
- Articles with unsourced statements from November 2015
- Commons category link is locally defined
- Astute-class submarines
- BAE Systems
- Nuclear-powered ships
- Proposed ships of the Royal Navy
- Submarine classes
- United Kingdom defence procurement