Guangdong Pumped Storage Power Station
Guangdong Pumped Storage Power Station | |
---|---|
![]() Overview rendition of the PSPS
|
|
Location of Guangdong Pumped Storage Power Station in China
|
|
Official name | 广州抽水蓄能电站 |
Country | China |
Location | Guangdong |
Coordinates | Lua error in package.lua at line 80: module 'strict' not found. |
Status | Operational |
Construction began | Stage I: 1989 Stage II: 1994 |
Commission date | Stage I: 1994 Stage II: 2000 |
Pumped-storage power station | |
Upper reservoir | Guangdong Upper |
Upper res. capacity | 24,080,000 m3 (19,522 acre⋅ft) |
Lower reservoir | Guangdong Lower |
Lower res. capacity | 23,400,000 m3 (18,971 acre⋅ft) |
Hydraulic head | 535 m (1,755 ft) (max. gross) |
Pump-generators | 8 × 300 MW (400,000 hp) |
Power generation | |
Nameplate capacity | 2,400 MW (3,200,000 hp) |
The Guangdong Pumped Storage Power Station or Guangzhou Pumped Storage Power Station (Chinese: 广州抽水蓄能电站) is a pumped-storage hydroelectric power station near Guangzhou, Guangdong Province, China. Power is generated by utilizing eight turbines, each with a 300 megawatts (400,000 hp) capacity, totalling the installed capacity to 2,400 megawatts (3,200,000 hp). The generated power is sold to China Light and Power customers in Hong Kong. The power station was constructed in two stages, the first four turbines were completed in 1994 and the second four in 2000.[1]
Operation
The station is composed mainly of a lower and upper reservoir and an underground power station. Water for the system is derived from the Liuxihe River. The lower reservoir has a capacity of 23,400,000 cubic metres (19,000 acre⋅ft) and is created by a 43.5 metres (143 ft) tall and 153.12 metres (502 ft) long gravity dam composed of roller-compacted concrete. Water from this reservoir is pumped into the upper reservoir which is created by a 68 metres (223 ft) tall and 318.52 metres (1,045 ft) long concrete face rock-fill embankment dam and has a capacity of 23,400,000 cubic metres (19,000 acre⋅ft). Water from the upper reservoir can then be re-released down two penstocks towards the power station. The same reversible pumps that moved the water up can now generate electricity. Just before reaching the power station, the two penstocks each split off into four separate branch pipes, each feeding one of the eight reversible 300 MW turbine generators with water. Once power generation is complete, the generators can reverse, pump the water back up to the upper reservoir and resume the process over again.[2]
See also
References
<templatestyles src="Reflist/styles.css" />
Cite error: Invalid <references>
tag; parameter "group" is allowed only.
<references />
, or <references group="..." />
External links
- Guangdong PPS at China Light & Power
- Pages with reference errors
- Articles containing Chinese-language text
- Energy infrastructure completed in 1994
- Energy infrastructure completed in 2000
- Hydroelectric power stations in Guangdong
- Pumped-storage hydroelectric power stations in China
- Dams completed in 1994
- Roller-compacted concrete dams
- Dams in China
- 1994 establishments in China
- Underground power stations