Karuma–Olwiyo–Pakwach–Nebbi–Arua Road

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Karuma–Olwiyo–Pakwach–Nebbi–Arua Road
Lua error in Module:Infobox_road/map at line 16: attempt to index field 'wikibase' (a nil value).
Route information
Length: 133 mi (214 km)
History: Designated 2001
Expected completion in TBD
Major junctions
Southeast end: Karuma
  Olwiyo
Pakwach
Nebbi
Northwest end: Arua
Highway system
Roads in Uganda

The Karuma–Olwiyo–Pakwach–Nebbi–Arua Road is a road in the Northern Region of Uganda, connecting the towns of Karuma, Olwiyo, Pakwach, Nebbi and Arua.

Location

The road starts at Karuma, and proceeds in a northwesterly direction through Olwiyo, crossing the Albert Nile at Pakwach, going through Nebbi and ending at Arua, a total distance of approximately 214 kilometres (133 mi).[1] However, the roadworks as contracted , measured 237 kilometres (147 mi).[2]

Upgrading to bitumen

In 2001, the government of Uganda borrowed US$64.5 million (USh100 billion at that time), from the International Development Association, to upgrade this road to class II bitumen surface, with drainage channels, culverts and shoulders.[3] The work as completed in sections, starting with the Arua–Nebbi section, which was completed in December 2003.[4] It continues to undergo periodic maintenance and rehabilitation.[5]

Points of interest

See also

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.

External links

Lua error in package.lua at line 80: module 'strict' not found.