Nordsee-Ost offshore wind farm
Nordsee-Ost offshore wind farm | |
---|---|
Location of Nordsee-Ost offshore wind farm of the coast of Germany in the North Sea
|
|
Country | Germany |
Location | North Sea |
Coordinates | Lua error in package.lua at line 80: module 'strict' not found. |
Status | Operational |
Commission date | May 2015 |
Owner(s) | RWE |
Power generation | |
Units operational | 48 × REpower 6.15 MW |
Nameplate capacity | 295 MW |
Website Nordsee Ost |
Nordsee-Ost offshore wind farm is an offshore wind farm in operation in the eastern part of the North Sea German sector. The project was developed by RWE Innogy, a subsidiary of RWE.
The wind farm consists of 48 turbines with a total capacity of 295 MW. The 6.15 MW turbines were provided by REpower.[1] Steel foundations for generators were supplied by Aker Verdal.[2][3] Power converters were supplied by Woodward Governor Company.[4] A consortium of Siemens and Prysmian built the high-voltage direct current submarine cable from the wind farm to the German transmission system operated by Transpower, a subsidiary of TenneT.[5]
Delays in power line construction by Dutch TenneT delayed its operational start.[6]
On 11 May 2015 the wind farm was officially put into operation.[7]
See also
References
<templatestyles src="Reflist/styles.css" />
Cite error: Invalid <references>
tag; parameter "group" is allowed only.
<references />
, or <references group="..." />
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.