Seville Metro
![]() |
|||
Overview | |||
---|---|---|---|
Native name | Metro de Sevilla | ||
Locale | Seville, Andalusia, Spain | ||
Transit type | Rapid transit/Light metro | ||
Number of lines | 1 (+ 3 in planning phase) | ||
Number of stations | 22 | ||
Annual ridership | 14.45 million (2014)[1][2] | ||
Website | Metro Sevilla (English) | ||
Operation | |||
Began operation | 2 April 2009 | ||
Operator(s) | Metro de Sevilla Sociedad Concesionaria de la Junta de Andalucía S.A.[3] | ||
Number of vehicles | 17 CAF Urbos 2 | ||
Technical | |||
System length | 18 km (11 mi)[4] | ||
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge | ||
Electrification | 750 V overhead power supply | ||
Top speed | 70 km/h (43 mph) | ||
|
The Seville Metro (Spanish: Metro de Sevilla) is a 18-kilometre (11 mi) light metro[5] network serving the city of Seville, Spain and its metropolitan area. The system is totally independent of any other rail or street traffic. All 22 stations were built with platform screen doors.
It was the sixth Metro system to be built in Spain, after those in Madrid, Barcelona, Valencia, Bilbao and Palma de Mallorca. Currently, it is the fifth biggest Metro company in Spain by number of passengers carried – it carried 14.45 million passengers in 2014.[1][2]
Contents
History
Original project
Construction of a metro in Seville began in 1974 with three proposed lines, covering only the city of Seville:
- Line 1:
- Stops: La Plata, Puerta Jerez, Plaza Nueva, Plaza del Duque, Alameda, Macarena, Pino Montano.
- Line 2:
- Stops: Santa Clara, Polígono San Pablo, Alhóndiga, Plaza del Duque, Marqués de Paradas, El Tardón, Rubén Darío.
- Line 3:
- Stops: Heliópolis, San Bernardo, Menéndez y Pelayo, Recaredo, Macarena, Cartuja.
This project was cancelled in 1983, after construction had begun on some of the tunnels, due to fears that historic buildings might be damaged. The economic viability of the metro was also questionable in a city whose population had not grown as much as predicted.
Revised metro project
In 1999 a new metro project was started by the Seville Metro Corporation (Spanish: Sociedad del Metro de Sevilla), founded by a former mayor of Seville. It was scheduled to be completed in 2006, but only began operation on 2 April 2009.[4]
The new project plans a network covering Seville and its metropolitan area (1,500,000 inhabitants) formed by four lines, all of them, completely independent of other traffic.
System
Metro de Sevilla | |||||
---|---|---|---|---|---|
Line | Terminals | Length | Stations | In service | Opened |
![]() |
Ciudad Expo Olivar Quintos |
|
|
|
|
Line 1
<templatestyles src="Module:Hatnote/styles.css"></templatestyles>
- Line 1, West-South
- Character: Underground
- Stations: 22[citation needed]
- Length: 18 km (11 mi)
- Start of the work: Late 2003
- Completion of the work: April 2009
- License holder: Grupo ACS, Grupo SyV, GEA 21, AOPJA, CAF.
Rolling stock
The Seville Metro fleet consists of 17 articulated low-floor Urbos 2 light rail vehicles (LRVs) manufactured by CAF. The Urbos 2 LRVs are 31-metre (102 ft) long, 2.65-metre (8.7 ft) wide, and 3.3-metre (11 ft) tall, with a total 6 doors on each side. Seating capacity per LRV vehicle is 192 passengers/vehicle (60 seated, 132 standing). The Urbos 2 LRVs have air conditioning. LRVs are powered by an overhead power supply at 750 Volts.[6]
Future service
Line 2 (in planning phase)
<templatestyles src="Module:Hatnote/styles.css"></templatestyles>
- Line 2, West-East
- Tipology: Underground
- Stops: 18
- Length: 13.4 km.
- Number of trains:
- Start of the works: Late 2011 (expected)
- End of the works: Late 2017 (expected)
- License holder:
Line 3 (in planning phase)
- Line 2, North-South
- Tipology: Underground
- Stops: 17
- Length: 11.5 km.
- Number of trains:
- Start of the works: Late 2011 (expected)
- End of the works: Late 2017 (expected)
- License holder:
Line 4 (in planning phase)
- Line 4, circular
- Tipology: Underground
- Stops: 24
- Length: 17.7 km.
- Number of trains:
- Start of the works: Late 2011 (expected)
- End of the works: Late 2017 (expected)
- License holder:
Tram lines
<templatestyles src="Module:Hatnote/styles.css"></templatestyles>
- MetroCentro (Seville)|MetroCentro (T1), surface tram through the centre of Seville: Street level.
- Stops: Plaza Nueva, Archivo de Indias, San Fernando and Prado de San Sebastián.
- Length: 2.7 kilometres
- Number of trains: 7 (manufactured by CAF).
- Start of the works: Mid 2005.
- End of the works: Spring/Summer 2007 (Only Prado de San Sebastián–San Fernando–Archivo de Indias–Plaza Nueva stations)
Future tramlines
- Aljarafe tram. Street level.
- Start of the works: 2005.
- Dos Hermanas tram. Street level.
- Start of the works: 2008.
- Alcalá de Guadaira tram. Street level.
- Start of the works: 2008.
See also
- MetroCentro Seville (i.e. Seville tramway)
- RENFE, operator of the commuter train system of Seville.
- Medium-capacity rail transport system
References
<templatestyles src="Reflist/styles.css" />
Cite error: Invalid <references>
tag; parameter "group" is allowed only.
<references />
, or <references group="..." />
External links
![]() |
Wikimedia Commons has media related to Metro Sevilla. |
- ↑ 1.0 1.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 2.0 2.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 4.0 4.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- Pages with reference errors
- Use dmy dates from May 2014
- Articles that mention track gauge 1435 mm
- Articles containing Spanish-language text
- Articles with unsourced statements from May 2014
- Commons category link is locally defined
- Seville Metro
- Rapid transit in Spain
- Underground rapid transit in Spain
- Tram transport in Spain