Stirling Highway

From Infogalactic: the planetary knowledge core
Jump to: navigation, search

Lua error in package.lua at line 80: module 'strict' not found.

Stirling Highway
Western Australia
270px
View west from Webster Street in Nedlands
General information
Type Highway
Length 13 km (8 mi)
Opened 1930s
Route number(s) State Route 5
Major junctions
Northeast end Mounts Bay Road (State Route 5), Crawley
  <templatestyles src="Plainlist/styles.css"/>
Southwest end High Street (State Route 7), Fremantle
Location(s)
Major suburbs Nedlands, Claremont, Cottesloe, Mosman Park, North Fremantle
Highway system
Highways in Australia
National HighwayFreeways in Australia
Highways in Western Australia

Stirling Highway is, for most of its length, a four-lane single carriageway and major arterial road between Perth, Western Australia and the port city of Fremantle in Western Australia on the northern side of the Swan River. The speed limit is 60 km/h. East of Crawley, it continues as Mounts Bay Road which links Crawley and the nearby University of Western Australia to the Perth central business district.

The highway passes through several of Perth's western suburbs, such as Nedlands, Claremont, Peppermint Grove, Cottesloe and Mosman Park. It also passes the University of Western Australia in Crawley, and several private secondary schools - namely Christ Church Grammar School, Presbyterian Ladies' College and Methodist Ladies' College. In addition, major shopping areas exist at Claremont and Cottesloe, while many smaller businesses and retailers are dotted along the highway. The section of road from Cottesloe leading south runs alongside the railway.

History

Stirling Highway initially developed as a rough track linking the new townsites of Perth and Fremantle following the establishment of the Swan River Colony in 1829. Construction of a formal road along the track's alignment did not take place for several decades, due to labour shortages, the slow initial development of the colony, the initial absence of a bridge across the Swan River at the southern end of the track, and the use of the river itself as the principal means of transport between the towns.

File:Halfway tree - Western Australia.jpg
Halfway tree: historical marker for the tree where mail was exchanged between Perth and Fremantle until 1867.

Convict labour was used to construct the road after the colony was constituted as a penal settlement in 1850, and this was completed by 1858. The road was declared a public highway in 1881.

The Perth to Fremantle railway line was completed in 1881, running alongside the road for part of its length. This spurred the development of Perth's western suburbs, including land alongside the road.

In 1930, the road was renamed for the first Governor of Western Australia, Admiral Sir James Stirling. Construction of the modern highway was formally commenced in the 1930s. It was completed in sections of approximately 1 mile per year. The schedule was as follows:

At the peak of trams and trolley buses in metropolitan Perth (from the 1930s to the early 1950s) several routes ran along Stirling Highway, and steel poles along the edge of the highway were used to hold the required wiring. Following the dismantling of the tramways, the remaining poles became rusty and quite unsightly, and most were removed in the early 2000s as part of the underground power project.underground power project

File:Stirling Highway (Stirling Bridge) south.ogv
Driving over the Stirling Bridge towards Fremantle

In the 1970s, a new crossing of the Swan River was constructed slightly to the east of the Fremantle Traffic Bridge. Named the Stirling Bridge, it was opened in 1974 by then Premier of Western Australia, Sir Charles Court[citation needed]. The highway was rerouted to the new bridge, and terminated at Canning Highway. The new bridge was part of a longer-term proposal to construct a new bypass of central Fremantle.[1]

An extension further south from Canning Highway to High Street was opened on 26 November by the state Minister for Transport, the Hon. Julian Grill, MLA. The cost of the project reached A$5.5m, including the compulsory acquisition and demolition of 90 homes. The project was jointly funded by the state and federal governments and was designed by consulting engineers, Airey, Ryan and Hill for the Main Roads Department, who undertook construction of the highway.[1] This section represented the first part of the planned Fremantle Eastern Bypass. Those plans have since been cancelled, and High Street represents Stirling Highway's permanent southern/western terminus.

See also

References

  1. 1.0 1.1 Stirling Highway southern extension (January 1986). Western Roads: official journal of the Main Roads Department, Western Australia, 11(1), p.15. Perth: Main Roads Department.
  • Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.

External links

Script error: No such module "Attached KML".

Media related to Lua error in package.lua at line 80: module 'strict' not found. at Wikimedia Commons