Taichung Power Plant
Taichung Power Plant | |
---|---|
Location of Taichung Power Plant in Taiwan
|
|
Official name | 台中發電廠 |
Country | Taiwan |
Location | Longjing District, Taichung City |
Coordinates | Lua error in package.lua at line 80: module 'strict' not found. |
Status | Operational |
Commission date | July 1990 (Unit 1-4 gas) March 1991 (Unit 1 coal)[1] August 1991 (Unit 2 coal) June 1992 (Unit 3 coal) October 1992 (Unit 4 coal) March 1996 (Unit 5 coal) May 1996 (Unit 6 coal) October 1996 (Unit 7 coal) June 1997 (Unit 8 coal)[2] August 2005 (Unit 9 coal) June 2006 (Unit 10 coal)[3] |
Owner(s) | Taipower |
Thermal power station | |
Primary fuel | Bituminous coal |
Secondary fuel | Natural gas |
Power generation | |
Units operational | 10 X 550 MW (coal) 4 X 70 MW (natural gas) 22 X 2 MW (wind power) |
Make and model | General Electric Toshiba |
Nameplate capacity | 5,824 MW 7,424 MW (Planned, 2030) |
Annual generation | 42 TWh |
The Taichung Power Plant (Chinese: 台中發電廠; pinyin: Táizhōng Fādiànchǎng) is a coal-fired power plant in Longjing, Taichung, Taiwan. With an installed coal-fired generation capacity of 5,500 MW, it is the largest coal-fired power station in the world,[4][5] and also the world's largest emitter of carbon dioxide with approximately 40 million tons annually (or about as much as the country of Switzerland as a whole).[6] Together with its gas-fired and wind generation units, the total installed capacity of the plant is 5,824 MW.
Contents
Generation units
The power plant consists of ten coal-fired units with nominal capacity of 550 MW each. Four original units were commissioned in 1991 and 1992. In 1996–1997, four additional units were added. The eight older units have a total estimated coal requirement of around 12 million tonnes of bituminous and 2.5 million tonnes of sub-bituminous coal a year. In August 2005 and June 2006, 550 MW sub-critical pressure units 9 and 10 were installed on the adjacent land reclaimed by depositing ash.[5]
In addition to ten coal-fired steam turbines, Taichung Power Plant has another four gas turbines and twenty two wind turbines which add another 280 MW and 44 MW additional capacity respectively.[7]
Components
The plant has a complex conveyor system. There are three belts from the Harbour which bring the coal into the plant via six ship unloaders, 2 bucket type and four screw type. The coal is either directed straight to a unit or stacked in the coal yard by 5 Stacker/ Reclaimers. The coal can be reclaimed from here and sent to any of the 10 units. There is built in redundancy in the critical conveyor paths.
All of the belts are equipped with fire detection system to monitor the temperature along the belt and to send alarms in the case of fire to minimize damage. The coal receiving facilities were completed in 1992.[8]
The boiler for each unit is drum type, water-cooled, naturally circulated with dry bottom furnace, balance draft and coal and oil-fired capability.
The steam turbine for each unit is a tandem-compound with four flow exhaust, single reheat and 550 MW rated capacity.
The generators are supercritical steam high power density.[2]
The electrostatic precipitator removes 99.8% of the particulates and classifies them for industrial cement and land reclamation.[9]
The power plant is connected to the grid via a 345 kV switchyard.[10]
Function
The power plant is designed for base load service and is able for daily startup and shutdown operation.[9] The plant's electricity is being sold to Taipower under a 25-year power purchase agreement.
Fuel supply
The power plant uses 12 million tons of bituminous and 2.5 million tons of sub-bituminous coal a year. Taipower buys 70% of the plant coal supply through long-term contracts from Australia, United States, South Africa, Indonesia and other sources. Indonesia is the prime source for the sub-bituminous coal. The remaining 30% of its coal supply is purchased on the spot market.[11]
Future expansion
There is an expansion plan to build two new 800 MW units by 2016.[3][12]
Awards
On 8 November 2010, the power plant won the outstanding award at the 23rd National QCC Competition, organized by Industrial Development Bureau of the Ministry of Economic Affairs.[13]
Transportation
Taichung Power Plant is accessible West from Longjing Station of the Taiwan Railway Administration.
See also
Wikimedia Commons has media related to Taichung Power Plant. |
- List of power stations in Taiwan
- Hai-Fu Power Station
- List of coal power stations
- List of largest power stations in the world
References
<templatestyles src="Reflist/styles.css" />
Cite error: Invalid <references>
tag; parameter "group" is allowed only.
<references />
, or <references group="..." />
- ↑ http://web3.moeaboe.gov.tw/ECW/english/content/ContentLink.aspx?menu_id=1540
- ↑ 2.0 2.1 http://www.power-technology.com/projects/taichung/
- ↑ 3.0 3.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 5.0 5.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ [1][dead link]
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 9.0 9.1 http://www.gibsin.com.tw/old/Case-Taichung1-10FPP.pdf
- ↑ http://www.industcards.com/st-coal-taiwan.htm
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- Pages with reference errors
- Articles containing traditional Chinese-language text
- Pages with broken file links
- Commons category link is defined as the pagename
- Coal-fired power stations in Taiwan
- Buildings and structures in Taichung
- 1992 establishments in Taiwan
- Articles with dead external links from June 2014