Agua Caliente Solar Project
Agua Caliente Solar Project | |
---|---|
Location of Agua Caliente Solar Project in Arizona
|
|
Country | United States |
Location | Yuma County, Arizona |
Coordinates | Lua error in package.lua at line 80: module 'strict' not found. |
Status | Operational |
Commission date | 2011 |
Construction cost | $1.8 billion |
Solar field | |
Type | Flat-panel PV |
Site area | 2,400 acres (971 ha) |
Power generation | |
Units operational | 5,200,000 |
Nameplate capacity | 290 MWp |
Annual generation | 626 GWh[1] (71 MW avg) |
The Agua Caliente Solar Project is a 290 megawatt (MW) photovoltaic power station, built in Yuma County, Arizona using thin-film technology based CdTe PV panels manufactured by First Solar.[2] The project was completed in April 2014.[3][4]
Contents
History
39 MW was online as of December 2011 and 100 MW was completed as of April 2012.[5] 200 MW was completed as of July 2012,[6] and 247 MW in August 2012, when the 10th section was completed. The addition of more panels has halted until 2013, with crates of panels covered to protect them.[7]
Project overview
In August 2011, the Department of Energy finalized a $967 million loan guarantee for the project. The project sponsor, NRG Solar, estimates the photovoltaic generation facility will fund approximately 400 construction jobs and 16 full-time operating jobs, and will be one of the largest plants of its kind in the world when completed.[8] The power produced will be sold to PG&E (Pacific Gas & Electric) in California in a 25-year Power Purchase Agreement.[1][9]
The Series 3 thin film panels use CdS/CdTe,[10] and are rated from 77 watts to 82.5 watts each,[11] and are mounted at a fixed tilt angle. 20,940 are connected in each array, rated at 1.26 MWAC, and over 400 SMA 720CP inverters are used. Two inverters are connected to each array.[12]
Award
In February 2012, Agua Caliente competed in the Excellence in Renewable Energy Awards and won Project of the Year Award.[9]
Electricity production
Year | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Total |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
2012 | – | – | 2,830 | 41,750 | 49,640 | 50,440 | 52,650 | 54,140 | 52,830 | 41,780 | 33,535 | 34,138 | 413,733 |
2013 | 45,555 | 53,720 | 61,050 | 64,998 | 65,452 | 63,631 | 61,470 | 64,870 | 64,605 | 48,294 | 47,742 | 50,790 | 692,177 |
2014 | 50,560 | 66,490 | 69,912 | 74,990 | 73,533 | 71,022 | 67,401 | 63,912 | 60,676 | 60,676 | 55,189 | 36,706 | 741,181 |
2015 | 46,007 | 54,670 | 65,495 | 70,829 | 70,829 | 69,880 | 69,307 | 70,319 | 60,023 | 56,974 | 54,110 | 49,378 | 737,821 |
2016 | 49,412 | 58,327 | 107,739 | ||||||||||
All-Time Total | 2,692,651 |
See also
References
<templatestyles src="Reflist/styles.css" />
Cite error: Invalid <references>
tag; parameter "group" is allowed only.
<references />
, or <references group="..." />
External links
- Project Datasheet
- Agua Caliente Solar Project, Arizona, United States of America
- ↑ 1.0 1.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ http://breakingenergy.com/2014/04/30/worlds-biggest-solar-pv-plant-a-feather-in-does-cap/
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 9.0 9.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ http://www.power-technology.com The world's biggest solar power plants, 29 August 2013
- ↑ http://www.powermag.com/agua-caliente-solar-project-yuma-county-arizona/?pagenum=1
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.