Centinela Solar Energy Project
From Infogalactic: the planetary knowledge core
Centinela Solar Energy Project | |
---|---|
Location of Centinela Solar Energy Project in California
|
|
Country | United States |
Location | El Centro, California |
Coordinates | Lua error in package.lua at line 80: module 'strict' not found. |
Status | Operational |
Commission date | 2013 |
Solar field | |
Site area | 2,067 acres (836 ha) |
Power generation | |
Nameplate capacity | 170 MW |
Website http://centinelasolar.com/ |
The Centinela Solar Energy Project is a 170 megawatt (MW) photovoltaic power plant located on 2,067 acres (836 ha) of previously disturbed private land southwest of El Centro, California. The project would support at least 235 jobs, generate more than $30 million in tax revenue over the life of the project, and deliver enough electricity to power about 82,500 homes. Imperial County gave a green-light to the solar power plant on December 27, 2011, and Secretary of the Interior Ken Salazar approved the right-of-way for 19 acres for the connecting power line on public land.[1]
The plant went online in tests on July 26, 2013.[2][3]
Electricity production
Year | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Total |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
2013 | 282 | 4,886 | 10,462 | 8,544 | 11,358 | 14,504 | 50,036 | ||||||
2014 | 14,603 | 18,196 | 32,012 | 37,607 | 51,878 | 54,129 | 50,286 | 47,862 | 46,089 | 39,786 | 32,985 | 23,830 | 449,236 |
2015 | 28,339 | 35,985 | 46,237 | 51,300 | 54,417 | 50,941 | 52,063 | 50,917 | 39,754 | 36,827 | 33,023 | 30,048 | 509,851 |
2016 | 29,254 | 29,254 | |||||||||||
Total | 1,038,377 |
References
<templatestyles src="Reflist/styles.css" />
Cite error: Invalid <references>
tag; parameter "group" is allowed only.
<references />
, or <references group="..." />
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ California's Energy Future
- ↑ http://www.sdge.com/newsroom/2013-08-09/three-more-solar-energy-projects-imperial-valley-connect-grid-now
- ↑ Lua error in package.lua at line 80: module 'strict' not found.