Solar Energy Generating Systems
<templatestyles src="Module:Hatnote/styles.css"></templatestyles>
Solar Energy Generating Systems | |
---|---|
![]() Part of the 354 MW SEGS solar complex in northern San Bernardino County, California.
|
|
Country | United States |
Location | Mojave Desert |
Coordinates | Lua error in package.lua at line 80: module 'strict' not found. |
Status | Operational |
Commission date | 1984 |
Owner(s) | NextEra Energy Resources |
Solar field | |
Type | CSP |
CSP technology | Parabolic trough |
Site area | 1,600 acres (647.5 ha) |
Power generation | |
Units operational | 9 |
Units cancelled | 3 |
Nameplate capacity | 394 MW |
Capacity factor | 21% |
Annual generation | 662 |
Solar Energy Generating Systems (SEGS) in California, with the combined capacity from three separate locations at 354 megawatts (MW, 474,700 hp), is now the world's second largest solar thermal energy generating facility, after the commissioning of the even larger Ivanpah facility in 2014. It consists of nine solar power plants in California's Mojave Desert, where insolation is among the best available in the United States. SEGS I–II (44 MW) are located at Daggett (Lua error in package.lua at line 80: module 'strict' not found.), SEGS III–VII (150 MW) are installed at Kramer Junction, and SEGS VIII–IX (160 MW) are placed at Harper Lake (Lua error in package.lua at line 80: module 'strict' not found.).[1] NextEra Energy Resources operates and partially owns the plants located at Kramer Junction and Harper Lake. A tenth plant (SEGS X, 80 MW) had been in construction and SEGS XI and SEGS XII had been planned by Luz Industries, but the developer filed for bankruptcy in 1992,because it was unable to secure construction financing.[2]
Contents
Plants' scale and operations
The plants have a 354 MW net (394 MW gross) installed capacity. The nameplate capacity, which operating continuously, would deliver the same net power output, coming only from the solar source is around 75 MWe —, representing a 21% capacity factor. In addition, the turbines can be utilized at night by burning natural gas.
NextEra claims that the solar plants power 232,500 homes (during the day, at peak power) and displace 3,800 tons of pollution per year that would have been produced if the electricity had been provided by fossil fuels, such as oil.[3]
The facilities have a total of 936,384 mirrors and cover more than 1,600 acres (647.5 ha). Lined up, the parabolic mirrors would extend over 229 miles (369 km).
As an example of cost, in 2002, one of the 30 MW Kramer Junction sites required $90 million to construct, and its operation and maintenance cost was about $3 million per year (4.6 cents per kilowatt hour).[4] With a considered lifetime of 20 years, the operation, maintenance and investments interest and depreciation triples the price, to approximately 14 cents per kilowatt hour.[citation needed]
Principle of operation
The installation uses parabolic trough, solar thermal technology along with natural gas to generate electricity. About 90% of the electricity is produced by the sunlight.[citation needed] Natural gas is only used when the solar power is insufficient to meet the demand from Southern California Edison, the distributor of power in southern California.
Mirrors
The parabolic mirrors are shaped like a half-pipe. The sun shines onto the panels made of glass, which are 94% reflective, unlike a typical mirror, which is only 70% reflective. The mirrors automatically track the sun throughout the day. The greatest source of mirror breakage is wind, with 3,000 mirrors typically replaced each year. Operators can turn the mirrors to protect them during intense wind storms. An automated washing mechanism is used to periodically clean the parabolic reflective panels.
Heat transfer
The sunlight bounces off the mirrors and is directed to a central tube filled with synthetic oil, which heats to over Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).. The reflected light focused at the central tube is 71 to 80 times more intense than the ordinary sunlight. The synthetic oil transfers its heat to water, which boils and drives the Rankine cycle steam turbine,[5] thereby generating electricity. Synthetic oil is used to carry the heat (instead of water) to keep the pressure within manageable parameters.
Individual locations
The SEGS power plants were built by Luz Industries,[5][6] and commissioned between 1984 and 1991. After Luz Industries' bankruptcy in 1991 plants were sold to various investor groups as individual projects, and expansion including three more plants was halted.[2]
Kramer Junction employs about 95 people and 45 people work at Harper Lake.
Plant | Year built |
Location | Turbine capacity |
Field area |
Oil temperature |
Gross solar production of electricity (MWh) |
||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
Net (MW) | Gross (MW) | (m²) | (°C) | 1985 | 1986 | 1987 | 1988 | 1989 | 1990 | |||
SEGS I | 1984 | Daggett | 14 | 14 | 82,960 | 307 | 19,261 | 22,510 | 25,055 | 16,927 | 23,527 | 21,491 |
SEGS II | 1985 | Daggett | 30 | 33 | 190,338 | 316 | 25,085 | 23,431 | 38,914 | 43,862 | 39,156 | |
SEGS III | 1986 | Kramer Jct. | 30 | 33 | 230,300 | 349 | 49,444 | 61,475 | 63,096 | 69,410 | ||
SEGS IV | 1986 | Kramer Jct. | 30 | 33 | 230,300 | 349 | 52,181 | 64,762 | 70,552 | 74,661 | ||
SEGS V | 1987 | Kramer Jct. | 30 | 33 | 250,500 | 349 | 62,858 | 65,280 | 72,449 | |||
SEGS VI | 1988 | Kramer Jct. | 30 | 35 | 188,000 | 390 | 48,045 | 62,690 | ||||
SEGS VII | 1988 | Kramer Jct. | 30 | 35 | 194,280 | 390 | 38,868 | 57,661 | ||||
SEGS VIII | 1989 | Harper Lake | 80 | 89 | 464,340 | 390 | 114,996 | |||||
SEGS IX | 1990 | Harper Lake | 80 | 89 | 483,960 | 390 | 5,974 | |||||
Total | 354 | 394 | 2,314,978 | 19,261 | 47,595 | 150,111 | 244,937 | 353,230 | 518,487 | |||
Sources: Solargenix Energy,[7] KJC Operating Company,[8] IEEE,[9] NREL[10][11] |
Gross solar production of electricity (MWh) |
||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Plant | 1991 | 1992 | 1993 | 1994 | 1995 | 1996 | 1997 | 1998 | 1999 | 2000 | 2001 | 2002 | average 1998–2002 | Total |
SEGS I | 20,252 | 17,938 | 20,368 | 20,194 | 19,800 | 19,879 | 19,228 | 18,686 | 11,250 | 17,235 | 17,947 | 17,402 | 16,500 | 331,550 |
SEGS II | 35,168 | 32,481 | 36,882 | 36,566 | 35,853 | 35,995 | 34,817 | 33,836 | 33,408 | 31,207 | 32,497 | 31,511 | 32,500 | 549,159 |
SEGS III | 60,134 | 48,702 | 58,248 | 56,892 | 56,663 | 64,170 | 64,677 | 70,598 | 70,689 | 65,994 | 69,369 | 66,125 | 68,555 | 995,686 |
SEGS IV | 64,600 | 51,007 | 58,935 | 57,795 | 54,929 | 61,970 | 64,503 | 71,635 | 71,142 | 63,457 | 64,842 | 70,313 | 68,278 | 1,017,283 |
SEGS V | 59,009 | 55,383 | 67,685 | 66,255 | 63,757 | 71,439 | 75,936 | 75,229 | 70,293 | 73,810 | 71,826 | 73,235 | 72,879 | 1,014,444 |
SEGS VI | 64,155 | 47,087 | 55,724 | 56,908 | 63,650 | 71,409 | 70,019 | 67,358 | 71,066 | 68,543 | 67,339 | 64,483 | 67,758 | 878,476 |
SEGS VII | 58,373 | 46,940 | 54,110 | 53,251 | 61,220 | 70,138 | 69,186 | 67,651 | 66,258 | 64,195 | 64,210 | 62,196 | 65,048 | 834,986 |
SEGS VIII | 102,464 | 109,361 | 130,999 | 134,578 | 133,843 | 139,174 | 136,410 | 137,905 | 135,233 | 140,079 | 137,754 | 138,977 | 137,990 | 1,691,773 |
SEGS IX | 144,805 | 129,558 | 130,847 | 137,915 | 138,959 | 141,916 | 139,697 | 119,732 | 107,513 | 128,315 | 132,051 | 137,570 | 125,036 | 1,594,852 |
Total | 608,960 | 538,458 | 613,798 | 620,358 | 628,674 | 676,091 | 674,473 | 662,631 | 636,851 | 652,835 | 657,834 | 662,542 | 654,539 | 8,967,123 |
Sources: Solargenix Energy,[12] KJC Operating Company,[8] IEEE,[9] NREL[11][13] |
Net solar production of electricity (MWh) |
||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Plant | 2003 | 2004 | 2005 | 2006 | 2007 | 2008 | 2009 | 2010 | 2011 | 2012 | 2013 | 2014 | average 2003–2014 | Total |
SEGS I[14] | 6,913 | 8,421 | 6,336 | 5,559 | 0 | 10,705 | 9,033 | 10,648 | 11,164 | 11,666 | 9,403 | 8,583 | 8,203 | 98,431 |
SEGS II[15] | 11,142 | 14,582 | 13,375 | 7,547 | 5,445 | 28,040 | 18,635 | 22,829 | 26,198 | 25,126 | 23,173 | 7,611 | 16,975 | 203,703 |
SEGS III[16] | 59,027 | 64,413 | 56,680 | 51,721 | 59,480 | 69,012 | 62,971 | 60,029 | 61,350 | 56,877 | 56,824 | 54,407 | 59,399 | 712,791 |
SEGS IV[17] | 58,100 | 62,006 | 56,349 | 52,439 | 59,799 | 69,338 | 63,563 | 63,084 | 57,684 | 62,414 | 58,317 | 54,321 | 59,785 | 717,414 |
SEGS V[18] | 61,921 | 67,717 | 62,309 | 53,471 | 59,547 | 69,316 | 59,820 | 54,328 | 60,451 | 62,877 | 57,758 | 56,354 | 60,489 | 725,869 |
SEGS VI[19] | 50,504 | 53,618 | 51,827 | 45,076 | 65,832 | 67,156 | 62,750 | 63,576 | 59,327 | 56,082 | 52,539 | 50,547 | 56,570 | 678,834 |
SEGS VII[20] | 49,154 | 50,479 | 46,628 | 42,050 | 58,307 | 65,185 | 58,950 | 58,836 | 57,378 | 54,147 | 48,183 | 46,762 | 53,005 | 636,059 |
SEGS VIII[21] | 119,357 | 124,089 | 120,282 | 117,451 | 122,676 | 135,492 | 131,474 | 155,933 | 152,463 | 145,247 | 141,356 | 145,525 | 134,279 | 1,611,345 |
SEGS IX[22] | 115,541 | 123,605 | 120,915 | 117,310 | 122,699 | 150,362 | 139,756 | 163,899 | 160,506 | 164,203 | 154,082 | 147,883 | 140,063 | 1,680,761 |
Total | 531,659 | 568,930 | 534,701 | 492,624 | 553,785 | 664,606 | 606,952 | 653,162 | 646,521 | 638,639 | 601,635 | 571,993 | 588,767 | 7,065,207 |
Harper Lake
SEGS VIII and SEGS IX, located at Lua error in package.lua at line 80: module 'strict' not found., until Ivanpah Solar Power Facility commissioning in 2014, were the largest solar thermal power plants individually and collectively in the world.[23] They were the last, the largest, and the most advanced of the nine plants at SEGS, designed to take advantage of the economies of scale. Construction of the tenth plant in the same locality was halted because of the bankruptcy of Luz Industries. Construction of the approved eleventh and twelfth plants never started. Each of the three planned plants had 80 MW of installed capacity.[24] Abengoa Solar recently constructed the 280MW Mojave Solar Project (MSP) adjacent to thee SEGS VIII and SEGS IX plants.[25] The MSP uses concentrating solar thermal technology as the SEGS projects.
Kramer Junction
This location (Lua error in package.lua at line 80: module 'strict' not found.) receives an average of 340 days of sunshine per year, which makes it an ideal place for solar power generation. The average direct normal radiation (DNR) is 7.44 kWh/m²/day (310 W/m²),[8] one of the best in the nation[citation needed].
Daggett
SEGS I and II are located at Lua error in package.lua at line 80: module 'strict' not found. and are owned by Cogentrix Energy (Carlyle Group).[26]
Accidents and incidents
In February 1999, a 900,000-US-gallon (3,400 m3) Mineral Oil storage tank exploded at the SEGS I (Daggett) solar power plant, sending flames and smoke into the sky. Authorities were trying to keep flames away from two adjacent containers that held sulfuric acid and sodium hydroxide. The immediate area of 0.5 square miles (1.3 km2) was evacuated.[27]
See also
<templatestyles src="Div col/styles.css"/>
- List of concentrating solar thermal power companies
- List of photovoltaic power stations
- List of solar thermal power stations
- Renewable energy in the United States
- Renewable portfolio standard
- Solar power
- Solar power plants in the Mojave Desert
- List of largest power stations in the world
- Solana Generating Station
References
<templatestyles src="Reflist/styles.css" />
Cite error: Invalid <references>
tag; parameter "group" is allowed only.
<references />
, or <references group="..." />
- ↑ The Energy Blog: About Parabolic Trough Solar
- ↑ 2.0 2.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ "Reducing the Cost of Energy from Parabolic Trough Solar Power Plants", NREL, 2003
- ↑ 5.0 5.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 8.0 8.1 8.2 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 9.0 9.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 11.0 11.1 Solar Electric Generating Station IX
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ EIA Electricity Data Browser - SEGS I
- ↑ EIA Electricity Data Browser - SEGS II
- ↑ EIA Electricity Data Browser - SEGS III
- ↑ EIA Electricity Data Browser - SEGS IV
- ↑ EIA Electricity Data Browser - SEGS V
- ↑ EIA Electricity Data Browser - SEGS VI
- ↑ EIA Electricity Data Browser - SEGS VII
- ↑ EIA Electricity Data Browser - SEGS VIII
- ↑ EIA Electricity Data Browser - SEGS IX
- ↑ Jones, J. (2000), "Solar Trough Power Plants", National Renewable Energy Laboratory. Retrieved 2010-01-04.
- ↑ California Energy Commission - Large Solar Energy Projects
- ↑ Abengoa Solar - The Mojave Solar Project
- ↑ SUNRAY/SEGS
- ↑ Storage Tank at Solar Power Plant in Desert Explodes; Immediate Area Is Evacuated
- Pages with reference errors
- Articles with Geo
- Articles with unsourced statements from June 2013
- Energy infrastructure completed in 1984
- Energy infrastructure completed in 1985
- Energy infrastructure completed in 1986
- Energy infrastructure completed in 1987
- Energy infrastructure completed in 1988
- Energy infrastructure completed in 1989
- Energy infrastructure completed in 1990
- Solar power in the Mojave Desert
- Solar power stations in California
- Buildings and structures in San Bernardino County, California
- NextEra Energy